2026年7月20日 9:39 ET 发布 · 更新于 4 个月前 · 1 个来源

THE BLOCK: Hut 8 and IREN each unveil billion-dollar AI infrastructure deals as the miner-to-AI pivot accelerates. $HUT signs a second $9.8 billion lease to fully commercialize its 1 GW Texas campus at $19.6 billion. $IREN adds $2.8 billion in contracts and lifts its 2026 revenue target above $4 billion.

TheBlockCo
TheBlockCo
·
原始报道

THE BLOCK: Hut 8 and IREN each unveil billion-dollar AI infrastructure deals as the miner-to-AI pivot accelerates. $HUT signs a second $9.8 billion lease to fully commercialize its 1 GW Texas campus at $19.6 billion. $IREN adds $2.8 billion in contracts and lifts its 2026 revenue target above $4 billion.

原文